Rural Home Calc

Drain Field Size Calculator (absorption area by soil type)

Minimum drain field absorption area from bedrooms and soil type, using Washington State's loading-rate table.

What size drain field do I need?

Find your bedroom count and soil type in the chart. Areas are square feet of infiltrative surface for ordinary septic tank effluent (Column A).

BedroomsSoil 1Soil 2Soil 3Soil 4Soil 5Soil 6
22402403004006001,200
33603604506009001,800
44804806008001,2002,400
56006007501,0001,5003,000
67207209001,2001,8003,600

Worked example

Source example

A 3-bedroom house in Washington has a design flow of 3 × 120 = 360 gallons per day. On soil type 4 (sandy loam or loam) with ordinary septic tank effluent, Table VIII allows 0.6 gallons per square foot per day, so the absorption area is 360 ÷ 0.6 = 600 square feet. On soil type 2 (coarse sand) at 1.0 it would be 360 square feet, and on soil type 6 at 0.2 it would be 1,800 square feet.

How it works

Washington sizes the infiltrative surface by dividing the design flow by the maximum hydraulic loading rate for the finest-textured soil within the vertical separation. Design flow for a single-family home is 120 gallons per bedroom per day (45 gpd per person, 2 people per bedroom, plus 33% surge), with a 240 gpd minimum. Soil type 7 (clays, cemented or massive soils) is unsuitable. Both the primary and the reserve area must be sized at 100% or more of the approved loading rate, and the local health officer may require Column A for the reserve. Only a soil log by a licensed designer can set your soil type, and other states use different tables.

Questions

How big is a drain field for a 3-bedroom house?

Under Washington's rule it's 360 gpd divided by your soil's loading rate: 360 sq ft in coarse sand, 600 sq ft in loam, and 1,800 sq ft in the slowest permitted soil type 6.

Can I build a drain field in clay?

Not a conventional one in Washington. Table VIII lists sandy clay, clay, silty clay and soils with massive or strong platy structure as unsuitable.

Do I need a reserve area?

Yes. WAC 246-272A-0234(8) says both the primary and reserve areas must be sized at least 100% of the approved loading rates.

Sources

Guides

More calculators